In data center documentation, the same asset information lives across BIM models, SLDs, cable and panel schedules — and they misaligned for certain procent due to design complexity and changies. ADFR extracts, cross-references, and aligns them into one consistent, verified information set.
| Asset Code | Status | BIM | SLD | Cable |
|---|---|---|---|---|
| FRA0_B1_DH-00-01_CRAH_001 | ⚠ SLD only | — | FRA0-ADFR-B1-SD-M-00001 v2 | — |
| FRA0_B1_DH-00-01_CRAH_002 | ⚠ SLD only | — | FRA0-ADFR-B1-SD-M-00001 v2 | — |
| FRA0_B1_DH-00-01_CRAH_003 | ⚠ SLD only | — | FRA0-ADFR-B1-SD-M-00001 v2 | — |
| FRA0_B1_DH-00-01_CRAH_004 | ⚠ SLD only | — | FRA0-ADFR-B1-SD-M-00001 v2 | — |
| FRA0_B1_DH-00-01_CRAH_005 | ⚠ SLD only | — | FRA0-ADFR-B1-SD-M-00001 v2 | — |
We offer: EIR development — defining exactly what information your project requires — and alignment reporting, where we extract asset data from SLDs, cable schedules, and BIM models and verify they all tell the same story.
We define exactly what information your project needs, how it should be structured, and who is responsible for delivering it — so there is no ambiguity about what "correct" looks like before work begins.
~70–80% baseline coverageSLDs, cable schedules, and BIM models all describe the same physical assets — but they live in different tools, authored by different teams, and updated at different times. We extract the data from each, cross-reference it automatically, and deliver a clear report showing exactly where the information diverges and why it matters.
Best prepared by an independent third partyWe start where the project is, formalise what already exists informally, then verify it holds.
We audit what's actually in the CDE — which asset codes exist, which BIM parameters are populated, and how the SLDs and schedules have been structured so far.
We build the EIR from the ground up — grounded in what the project is already doing. We formalise the informal rules, naming conventions, and information patterns that exist in practice, not just on paper.
We verify whether the BIM model and SLDs actually meet the EIR we've defined — including the rules that were never written down but always expected. Deviations get flagged before they compound.
We cross-reference BIM, SLDs, and cable schedules — extracting asset data from each and checking for consistency. The result is a clear report of what aligns, what doesn't, and what needs to be resolved.
Every party on a project has a different reason to want clean, aligned information — but they all benefit from the same report.
Catch misalignments between BIM, SLDs, and schedules before construction starts — when fixes are cheap. Reduce the risk of discovering errors on site that blow up your budget and timeline.
Get an independent cross-check across all your deliverables before they're issued. Hand over a coordinated, defensible information set — and protect your reputation in the process.
During tender, surface the inconsistencies between BIM, SLDs, and schedules — so you can flag them to the client and budget realistically for the corrections that will be needed.
Tell us about your data center project and we'll get back to you — usually within one business day.